Details:
Hotchley Hill Signal Box
Completion of this landmark building will enable signal box controlled running at Rushcliffe Halt Station. The box has already been made watertight, windows and doors replaced and frames installed. By summer 2026 the box will be connected to the National Grid. We now need £50,000 to complete the signalling at Rushcliffe Halt.

